Skip to main content

Drips Stellar Wave Readiness Ledger

This ledger coordinates the remediation work identified by the October 7, 2026 Drips Stellar Wave readiness audit. It records evidence without treating plans, local tests, deployments, or organizer decisions as interchangeable.

The authoritative local source documents are DRIPS_STELLAR_WAVE_READINESS_AUDIT.md and DRIPS_STELLAR_WAVE_AUDIT_IMPLEMENTATION.md. The tracking issues below own the public execution record.

Evidence States​

StateMeaningDoes not prove
localA named command passed in a maintainer checkout at a recorded commit.CI, deployment, or public reproducibility.
ciA public CI run passed for the exact commit and required checks.That an artifact was deployed or works on testnet.
deployedA pinned artifact is reachable in a named environment.Correct payment behavior, finality, or persistence.
testnet-provenPublic testnet transactions and state changes prove the claimed behavior.Mainnet readiness or independent review.
reviewedA focused pull request passed its completion check and was reviewed.Drips acceptance.
wave-approvedThe organizer approved the repository or issue for a named Wave.Product security beyond the submitted evidence.

Evidence states are cumulative only when each lower state is independently recorded. A health response, mock, fixture, or deployment manifest cannot be promoted to testnet-proven without lifecycle evidence.

October 7, 2026 Baseline​

RepositoryBaseline commitPublic CILocal validationDependency auditPublic capability
lumenbazaar-contractsfe15b32CI passed70 tests, formatting, clippy, locked WASM build, binding and evidence checks passed.No known vulnerability; one informational unmaintained paste warning.Testnet upload, deployment, initialization, interface, and WASM hash are public. A payment lifecycle is not proven.
lumenbazaar-backendf2fa194CI passed163 tests plus OpenAPI, formatting, lint, typecheck, and Prisma checks passed.13 high and 1 critical production finding reported./health is reachable, but /version reports local, /v1/supported is empty, discovery is empty, and /mcp returns 404.
lumenbazaar-frontend4648d3bCI passed104 unit tests, production build, and 6 desktop/mobile Playwright checks passed.15 high and 1 critical production finding reported.The public site is reachable, but payment uses a v1-style preview or wallet draft and operational data can use fixtures.
lumenbazaar-docs1639638CI passedMarkdown, links, generated-reference, content, consistency, and production build checks passed.20 high and 18 critical affected production packages reported.The public site is reachable, but deployment statements and generated references are not release-synchronized.

The dependency counts are package-manager results, not exploitability findings. They remain open gates until each path is upgraded or covered by a reviewed, time-bounded exception.

Deployment Baseline​

The public probes below were repeated on October 7, 2026.

TargetURL or identifierObserved state
FrontendPublic frontendHTTP 200.
DocsPublic docsHTTP 200.
Backend APIPublic backendHealth HTTP 200; version 0.1.0; environment local.
Backend exact capability/v1/supportedNo payment schemes advertised.
Backend discovery/v1/discovery/searchNo resources indexed.
Backend MCP/mcpHTTP 404.
upto-session contractCCO7IMY4LYPWNKXEQ44LKTRMPZBQC7UM7JV3MOGGMB5GC4246I7Y2RB6Testnet deployment exists; live funding and settlement are not proven.
Contract WASM23ee0112e5748a1450669d82063e72c32cecfea52b0a07d3edd54d727ab45eafPublished hash matches the audited build and live contract.

Compatibility Matrix​

Matrix entryFrontendBackendContractsDocsHighest common evidenceStatus
baseline-2026-10-074648d3bf2fa194fe15b321639638ciIncompatible as a complete payment product: exact is disabled, upto authorization is unproven, and public docs are stale.
remediation-candidate-2026-10-07dc41e2c463795910460b5d48d595 plus current docs phasesContract: testnet-proven; other repositories: localContract escrow lifecycle is public. Backend and frontend exact flow is locally validated but not deployed, so Gates B-D remain open.

Add a new immutable row for every release candidate. Never overwrite a prior row to make a newer combination appear historically compatible.

The current component-by-component truth and the replacement testnet contract ID are maintained in the deployment and capability matrix. The deployment baseline above is retained as a dated historical observation and must not be used as current configuration.

Blocking Findings And Ownership​

FindingRequired outcomeOwning phases
P0-1: capped-session authorization is unprovenSelect, implement, test, deploy, and publish a real funding and recovery model.2-11
P0-2: official exact x402 is not implementedComplete official v2 transport, signing, verification, settlement, persistence, and buyer flow.14-20, 24, 26-29
P0-3: no reproducible reviewer pathPublish a real paid resource, MCP service, wallet flow, receipt, explorer evidence, and five-minute guide.21-24, 27-31, 35
P1-1: payment state is ephemeralMake attempts, settlement, receipts, replay controls, jobs, and recovery durable.18-20
P1-2: deployment is development-likeEnforce real environment configuration, readiness, observability, and capability reporting.13, 23-24
P1-3: documentation is inconsistentSynchronize generated artifacts and deployment, security, license, and capability claims.33-35
P1-4: maintainer execution is unprovenDemonstrate protected, reviewed, released, triaged, and responsive repository operation.36-40
P1-5: dependency security gate failsRemove or explicitly review critical and high production findings in each affected repository.9, 12, 25, 32

Phase Tracking​

All entries start open. A tracking issue closes only after its completion check, repository gate, evidence record, review, and commit are complete.

PhaseOwnerTracking issueInitial state
1Docs coordinationdocs #21In progress
2Contractscontracts #21Open
3Contractscontracts #22Open
4Contractscontracts #23Open
5Contractscontracts #24Open
6Contractscontracts #25Open
7Contractscontracts #26Open
8Contractscontracts #27Open
9Contractscontracts #28Open
10Contractscontracts #29Open
11Contractscontracts #30Open
12Backendbackend #21Open
13Backendbackend #22Open
14Backendbackend #23Open
15Backendbackend #24Open
16Backendbackend #25Open
17Backendbackend #26Open
18Backendbackend #27Open
19Backendbackend #28Open
20Backendbackend #29Open
21Backendbackend #30Open
22Backendbackend #31Open
23Backendbackend #32Open
24Backendbackend #33Open
25Frontendfrontend #21Open
26Frontendfrontend #22Open
27Frontendfrontend #23Open
28Frontendfrontend #24Open
29Frontendfrontend #25Open
30Frontendfrontend #26Open
31Frontendfrontend #27Open
32Docsdocs #22Open
33Docsdocs #23Open
34Docsdocs #24Open
35Docsdocs #25Open
36Cross-repository governancedocs #26Open
37Cross-repository issue curationdocs #27Contracts backlog prepared; independent estimate and dashboard points pending
38Application preparationdocs #28Evidence pack prepared; Gate E remains open
39Contractscontracts #31Not submitted: exact blockers recorded
40Wave operationsdocs #29Inactive operations ledger prepared; blocked on organizer approval
41Backendbackend #34Candidate set prepared; application blocked on Gate B
42Frontendfrontend #28Candidate set prepared; application blocked on Gates B and C
43Docsdocs #30Retained as non-applied supporting infrastructure

Existing Wave Candidates​

Issues 1-8 in each repository retain their existing wave-ready label for history and now also carry readiness-provisional. Phase 37 must remove that provisional label only after confirming the issue is still meaningful, bounded to one contributor and one Wave, objectively testable, unassigned, and free of hidden application prerequisites.

Update Rules​

  • Record the starting commit before each phase.
  • Link focused checks, the full repository gate, dependency audit, and public evidence in the owning tracking issue.
  • Keep exact x402 and experimental upto evidence separate.
  • Append compatibility rows; do not rewrite old rows.
  • Do not promote mocked, fixture-backed, in-memory, placeholder, or planned behavior to deployed or testnet-proven evidence.
  • Keep phases open when a stop condition applies, and record the exact blocker.
  • Recheck Drips dates, limits, budgets, KYC, and program rules immediately before any application action.